Charles Church
Sherburn In Elmet
Project Requirements
Contract to complete all final finishing works to roads and footpaths.
To include :
- kerb replacements
- full gully builds
- setting iron works
- block paving roads
- tarmac removal and laying to footpaths and roads
- ramp formations
- drainage including drive acos
- lampost build out
- BT lids , Water Taps , Service lids
What We Delivered
As seen in the photos, our men provide a very high standard of finishing.
various areas of tarmac laid on roads and footpaths approximatley 1500 m2
Kerbs all laid and Ironworks fitted
Fully insured and CHAS accredited
All machinery is provided by Advanced Paving and construction ltd
Accreditations


